Material pair and surface condition
Confirm the exact substrates, coatings, surface oils, cleanliness and preparation process before testing.
Joint design and technical requirements
Provide the geometry, bond line, mechanical loads, and the relevant thermal, electrical and environmental requirements.
Production conditions
Review the dispensing method, mixing ratio where applicable, working time, and the thermal or curing cycle.
TDS, SDS and testing
Review the documentation for the exact grade, evaluate a sample and confirm the process before production use.
Do not transfer specifications, primer, cleaner, activator or process conditions from another grade. Confirm the TDS and SDS, substrate pair, surfaces, equipment and testing before production approval. Contact AE-TECH to confirm documentation, package format and availability for the project in Vietnam.